PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Constructing parapet along the High Roof Facing South-West.jpg Constructing the parapet along the high roof Facing East.jpg Installed junction boxes at the cmu wall.jpg Installed roof drains at the low roof Facing North-East.jpg Installing ductwork at the 4th floor Facing West.jpg Installing electrical conduit above the ceiling at the 4th floor Facing South.jpg Installing electrical conduit above the ceiling at the 4th floor Facing West.jpg Installing sheathing around the perimeter of the Skylight Facing East.jpg Installing storm piping for the high roof Facing North.jpg
Previous pageNext page Installing ductwork at the 4th floor Facing West
Installing ductwork at the 4th floor Facing West